ARAMA SONUÇLARI

Toplam 122 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Factors Affecting the Choice of Dispute Resolution Methods in International Construction Contracts
5th International Project and Construction Management Conference, 16 Kasım 2018
BAHEMAT SAHAR,ÇAKMAK FATMA PINAR,GİRİTLİ FATMA HEYECAN
Fatma Pınar Çakmak Tam metin bildiri
Safe Work Statement for Construction Activities
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 453-463
UZUN İBRAHİM MERT,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
The New Severity Scale of Occupational Accidents for Construction Projects
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Investigation of Productivity in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 641-644
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Occupationally Safer Designs in Construction Industry: BIM Based Solution Method
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
TOZER KEMAL DİRGEN,ÇELİK TAHİR,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Hierarchy of Control Measures for Common Construction Activities: A Field Study
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
UZUN MERT,BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE,ÇEBİ SELÇUK
Gürkan Emre Gürcanlı Tam metin bildiri
Relative Importance of Productivity Factors in Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 645-650
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Use Of The Design Structure Matrix During The Construction Phase Of Building Production Process In Turkey
6th International Project and Construction Management e-Conference (e-IPCMC-2020), istanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 248-256
BUĞAN JİBİD,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Performance Forecasting Methods in Construction Industry Deterministic Approach,
6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 151-161
YAYLALI RÜÇHAN,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Classification Of Construction Waste According To Lean Management Approach
6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 143-150
CAN GİZEM,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Turkish Architectural and Civil Engineering Education within the Scope of Sustainable Construction
5. International Project Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 200-208
TOPAK FATİH,TOKDEMİR ONUR BEHZAT,PEKERİÇLİ MEHMET KORAY,TANYER ALİ MURAT
Onur Behzat Tokdemir Tam metin bildiri
Exploring the Adaptability of Daily Look-Ahead Meetings in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), İstanbul/TÜRKİYE, 12 Kasım 2020, s. 1318-1325
YILMAZ ANIL,TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Tam metin bildiri
Evaluation of Construction and Demolition Wastes in the Context of the Waste Framework Directive of the European Union Member States
7th International Project and Construction Management Conference (IPCMC2022), İstanbul/TÜRKİYE, 21 Ekim 2022
SÖNMEZ NURŞEN, MAÇKA KALFA SİBEL
Nurşen Sönmez Tam metin bildiri
A Proposed Model for Estimation of Ideal Construction Duration in Housing Projects
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 216-231
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Total Construction Duration Calculation of TOKI Housing Projects: A Case Study
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, 20 Ekim 2022, s. 204-215
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Currency Risk Analysis on Construction Cash Flows
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 1138-1144
TÜZ ÖZLEM, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
The Turkish Construction Sector from a Macroeconomic Perspective
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 545-562
BÜYÜKYORAN FARUK, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Construction Schedule Management and BIM: A Bibliometric Literature Review
6th International Project and Construction Management Conference (e-IPCMC 2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 111-120
SARAÇ ÇIRACIOĞLU AYŞEN,YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Electronic Procurement Systems and Building Information Modeling Integration in Construction Sector: A Case Study
5th International Project and Construction Management Conference (IPCMC 2018), Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, Vol. 1, No. 1, 16 Kasım 2018, s. 290-297
SARAÇ ÇIRACIOĞLU AYŞEN,YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Construction Project Managers’ Motivators and Human Values
Journal of Construction Engineering and Management, Vol. 143, No. 4, Nisan 2017, s. 4016115, ISSN: 0733-9364
WANG DI,ARDITI DAVID,DAMCI ATİLLA
Atilla Damcı Özgün Makale

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930